ESIE11-02
Maintenance
5–5
3
5
1
5
Expansion valve
The expansion valve will allow the correct amount of refrigerant to enter the evaporator to match the
cooling load (by keeping a constant superheat). Follow the instructions below to check the expansion
valve.
■
Check the superheat setting.
■
Inspect the bulb / power-head capillary connection (no chaffing).
■
Inspect the equaliser line visually.
■
Inspect the feeler bulb suction pipe connection / insulation.
Flow switch and
pump interlock
Follow the instructions below to check the flow switch and the pump interlock.
■
Check operation by ohmmeter after disconnecting the wires to the field terminals and simulating
flow and no-flow conditions.
■
Inspect the flow-switch for possible corrosion (glycol applications). Check electrical connections for
shunts or bridges.
Summary of Contents for EUWAB10KBZW1
Page 2: ......
Page 8: ...ESIE11 02 vi Table of Contents 3 1 4 5...
Page 10: ...Introduction ESIE11 02 viii 3 1 4 5...
Page 12: ...ESIE11 02 1 2 Part 1 System Outline 3 1 1 5...
Page 86: ...Wiring Layout ESIE11 02 1 76 Part 1 System Outline...
Page 88: ...ESIE11 02 2 2 Part 2 Functional Description 3 1 2 5...
Page 128: ...The Digital Controller ESIE11 02 2 42 Part 2 Functional Description 3 1 2 4 5...
Page 130: ...ESIE11 02 3 2 Part 3 Troubleshooting 3 1 3 5...
Page 168: ...ESIE11 02 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Page 198: ...Test Run and Operation Data ESIE11 02 4 32 Part 4 Commissioning and Test Run 3 1 4 5...
Page 200: ...ESIE11 02 5 2 Part 5 Maintenance 3 1 5...
Page 210: ...ESIE11 02 4 Index 3 1 4 5...