Functional Description
ESIE11-02
2–18
Part 2 – Functional Description
3
1
2
4
5
1.14
Defrost Management for EUWY*5-24KBZW1
Functional
description
The characteristics of the defrost management are the following:
■
The defrost function is only active in heating mode.
■
The defrost cycle can only be performed if the compressor is on.
■
When a defrost cycle is active in a circuit, the reversing valve of that circuit is switched.
■
When a defrost cycle is active, all the fans in circuit 1 and circuit 2 are switched off or run on
medium speed.
■
The defrost function is executed in the I/O PCB and there will be no defrost indication on the
controller.
■
If the defrost function for circuit 1 is active, circuit 2 is stopped by opening DO10.
■
If the defrost function for circuit 2 is active, circuit 1 is stopped by opening DO9.
■
Priority: when the defrost function is activated for the 2 circuits, only one of the circuits will
alternately be defrosted.
Illustration
dipswitches S2A
The illustration below shows the defrost dipswitches on the PCB.
Function
dipswitches S2A
The table below describes the function of the dipswitches on the PCB.
1
2
S2A
S2A
Dipswitch
1
Defrost setting
0 = Start condition 1 & fan defrost 1 (5HP, 8HP, 16HP)
1 = Start condition 2A/B & fan defrost 2 (10HP, 12HP, 20HP, 24HP)
2
Fan setting
0 = Fan setting 1 (5HP, 8HP, 16HP)
1 = Fan setting 2 (10HP, 12HP, 20HP, 24HP)
Summary of Contents for EUWAB10KBZW1
Page 2: ......
Page 8: ...ESIE11 02 vi Table of Contents 3 1 4 5...
Page 10: ...Introduction ESIE11 02 viii 3 1 4 5...
Page 12: ...ESIE11 02 1 2 Part 1 System Outline 3 1 1 5...
Page 86: ...Wiring Layout ESIE11 02 1 76 Part 1 System Outline...
Page 88: ...ESIE11 02 2 2 Part 2 Functional Description 3 1 2 5...
Page 128: ...The Digital Controller ESIE11 02 2 42 Part 2 Functional Description 3 1 2 4 5...
Page 130: ...ESIE11 02 3 2 Part 3 Troubleshooting 3 1 3 5...
Page 168: ...ESIE11 02 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Page 198: ...Test Run and Operation Data ESIE11 02 4 32 Part 4 Commissioning and Test Run 3 1 4 5...
Page 200: ...ESIE11 02 5 2 Part 5 Maintenance 3 1 5...
Page 210: ...ESIE11 02 4 Index 3 1 4 5...