Overview of Inputs and Outputs
ESIE98–06A
3–4
Part 3 – Troubleshooting
3
1
3
4
5
1.2
Overview of Inputs and Outputs of EUWA/Y5-10HB(Z)
Inputs/outputs
The following table describes the relation between the wiring diagram symbols and the wiring
connections of chiller types EUWA/Y5-10HB(Z) and also the malfunction (or program) code. We refer
to the wiring diagram and the PCB layout to find the exact location on both wiring diagram and switch
box.
Type
Detail
Wiring
diagram
symbol
Wiring con-
nection
terminal
Malfunction
(or program)
code
Description
analog input
sensor
R3T
X1/B1-GND
e1
-
a1
inlet water temperature sensor
R4T
X1/B2-GND
e2
(
r6
)
outlet water temperature sensor
R5T
X1/B3-GND
e3
(
r8
)
coil temperature sensor
digital input
transducer
R1P
X1/ALL
h1
/
fl
reverse phase protector
S11L+S10L
X1/ID1-GND
h1
flow switch pump contact
Q11F
X1/ID4-GND
f1
evap. thermostat
K1A
X1/ID1-GND
h1
auxiliary relay for high pressure
K4S
X1/ID3-GND
c1
/
h1
overcurrent relay+hp=discharge protector
S16T
X1/ID4-GND
l1
evaporating temperature thermostat
control
contacts
S7S (field)
X1/ID2-GND
(
h6
)
switch for remote cool/heat selection
S9S (field)
X1/ID5-GND
(
h7
)
switch for remote start/stop
S10L (field)
X1/ID1-GND
(
fl
)
flow switch
S11L (field)
75-77
—
contact that closes if the pump is working
digital out-
put
K1M
X2C1/2-NO1
—
compressor contactor
YRV1
X2C3/4-NO4
—
4 way valve
KP (field)
X2C3/4-NO3
—
pump contactor
H1P (field)
X2C5-NO5
—
indication lamp alarm
Summary of Contents for EUWA/Y5-30HB/C(Z)
Page 2: ......
Page 8: ...Introduction ESIE98 06A vi 3 1 4 5...
Page 10: ...ESIE98 06A 1 2 Part 1 System Outline 3 1 1 4 5...
Page 28: ...General Outline ESIE98 06A 1 20 Part 1 System Outline 3 1 1 4 5...
Page 36: ...Piping Layout ESIE98 06A 1 28 Part 1 System Outline 3 1 1 4 5...
Page 52: ...ESIE98 06A Wiring Layout Part 1 System Outline 1 44...
Page 58: ...ESIE98 06A 2 2 Part 2 Functional Description 3 1 2 4 5...
Page 100: ...ESIE98 06A 3 2 Part 3 Troubleshooting 3 1 3 4 5...
Page 134: ...Troubleshooting ESIE98 06A 3 36 Part 3 Troubleshooting 3 1 3 4 5...
Page 136: ...ESIE98 06A 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Page 142: ...Pre Test Run Checks ESIE98 06A 4 8 Part 4 Commissioning and Test Run 3 1 4 5...