Daikin Europe NV
15
4.3.3
Assembling the unit
1.
Unpack the unit.
2.
Check the content of the packaging, which consists of:
•
Unit (A)
•
Suspension strip (B)
•
Siphon (C)
•
Flexible tube (D)
•
Installation instructions
•
Operating instructions
•
Warranty card
3.
Check the unit for any damage: immediately report damages to the supplier.
4.
Install the suspension strip.
5.
Check whether the compression rings are positioned straight in the couplings of
the assembly bracket.
6.
Position the unit: slide it from top to bottom over the suspension strip (B). Make
sure the pipes slide into the compression fittings simultaneously.
7.
Tighten the compression fittings onto the assembly bracket.
The nipples and pipes must not rotate with it!
8.
Open the display valve and loosen the two screws on the left and right of the
display, and remove the front panel.
9.
Assemble the flexible tube (D) onto the outlet of the siphon.
10.
Fill the siphon with water, and slide it as far as possible on top of the condense
output connector (E) under the unit.
11.
Seal flexible tube (D) of the siphon, if possible together with the overflow pipe of
the inlet combination and the overflow valve, to the sewage via open connection
(F).
12.
Assemble the air supply and the burning gas outlet (see par. 5.6).
13.
Assemble the cover and tighten the two screws to the left and the right of the
display, and close the display cover.
4.3.4
Apply cover plate (optional)
Suspend the converted top edge of the cover plate from the washers underneath the
bottom of the unit, and slide the cover plate as far back as possible.
Danger: risk of burning
In case of high leaving water set ponts for space heating (eighter a high fixed set point
or a high weather-dependent set point at low ambient temperatures), the heat
exchanger of the boiler can be very hot, for example 70°C.
Beware that in case of a tapping demand, the water can initially have a higher water
temperature than requested.
In this case, it is recommended to install a thermostatic valve to prevent scalding.
This can be done according to the schematics below.
a=boiler, b=DHW from boiler, c= cold water inlet,
d=shower, e=thermostatic valve (field supply)
Summary of Contents for EKOMBG22ABV1
Page 29: ...Daikin Europe NV 31...
Page 82: ...Daikin Europe NV 31...
Page 136: ...Daikin Europe NV 32...
Page 189: ...Daikin Europe NV 31...
Page 242: ...Daikin Europe NV 32...
Page 295: ...Daikin Europe NVs GmbH 31...
Page 347: ...Daikin Europe NV 31...
Page 372: ...Daikin Europe NV 4 Daikin EKOMBG22ABV1 EKOMBG28ABV1 EKOMBG33ABV1 CH DHW O...
Page 377: ...Daikin Europe NV 9 3 A CH L B C M D S1 N X4 E S2 O F P S3 G Q H R I 230 V S J T K U...
Page 381: ...Daikin Europe NV 13 4 2 1 2 cm O 4 2 1 50 cm2 4 2 2 A 1 2 70 C a b DHW c d e...
Page 382: ...Daikin Europe NV 14 4 3 EKVK4AA B 4 3 1 4 3 2...
Page 387: ...Daikin Europe NV 19 5 3 1 3 mm 1 2 A 3 1 4 2 5 6 10 2 7 8 5 3 1 X4 6 7 11 12 8 9 6 7...
Page 389: ...Daikin Europe NV 21 RF CH 5 RF CH 2 C rF L RF RF 1 5 4 4 10 1 7 5 5 5 1 1 2 2 3 4 50 mbar 5...
Page 391: ...Daikin Europe NV 23 5 2 CE B23 B33 C13 C33 C43 CLV C53 C63 CE...
Page 398: ...Daikin Europe NV 30 5 5 5 O 1 5 3 250 mm 2000 mm 1000 mm 1 500 mm...
Page 399: ...Daikin Europe NV 31...
Page 405: ...Daikin Europe NV 37 6 3 1 2 3 4 5 6 6 3 1 10 2...
Page 406: ...Daikin Europe NV 38 7 7 1 LED CH bar q 0 Su Et q LED Eco LED LED 8 2 LED 2 LED LED LED 30...
Page 414: ...Daikin Europe NV 46 8 3 8 3 1 7 7 7 8 8 3 2 20 mbar 7 7 7 8 8 3 3 CH 10 1 OpenTherm CH RF 80...
Page 417: ...Daikin Europe NV 49 9 9 1 1 1 2 3 4 5 6 7 1 2 3 8 4 5 6 9 10 11 Allen 12 9 1 2 1 2 3 4 5...
Page 418: ...Daikin Europe NV 50 9 1 3 1 2 O 10 12 Nm 3 4 5 6 1 2 3 A 7 8 9 10 CH 11 12 13 14 7 7 7 8 15 16...
Page 423: ...Daikin Europe NV 55 11 Daikin Europe NV CH...
Page 424: ...008 1548499_04 05 2022 88550712...