Daikin Europe NV
30
5.10.5
Securing the flue system
IMPORTANT
•
These regulations are typical for both concentric and parallel flue
systems.
•
The flue system must be secured to a solid structure.
•
The flue system should have a continuous fall back to the boiler (1.5° to
3°). N.B. Wall terminals must be installed leveled..
•
Only use accompanying brackets.
•
Every elbow must be secured by using the bracket.
Exception at connecting on boiler:If the lenght of the pipes before and after
the first elbow, are no more than 250 mm, the second element after the
first elbow has to contain a bracket.
Note: The bracket must be positioned on the elbow!
•
Every extension must be secured per metre with a bracket.
This bracket must not be clamped around the pipe ensuring free
movement of the pipe..
•
Make sure bracket is locked into the correct position depending on the
position of the bracket on the pipe or elbow:
•
Do not mix flue parts or clamps of different suppliers.
Max. distance between clamps
Vertical
Others
2000 mm
1000 mm
•
Divide the lengths between the brackets evenly.
•
Every system must contain at least 1 bracket.
•
Position the first clam at a maximum of 500 mm from the boiler.
Summary of Contents for EKOMBG22ABV1
Page 29: ...Daikin Europe NV 31...
Page 82: ...Daikin Europe NV 31...
Page 136: ...Daikin Europe NV 32...
Page 189: ...Daikin Europe NV 31...
Page 242: ...Daikin Europe NV 32...
Page 295: ...Daikin Europe NVs GmbH 31...
Page 347: ...Daikin Europe NV 31...
Page 372: ...Daikin Europe NV 4 Daikin EKOMBG22ABV1 EKOMBG28ABV1 EKOMBG33ABV1 CH DHW O...
Page 377: ...Daikin Europe NV 9 3 A CH L B C M D S1 N X4 E S2 O F P S3 G Q H R I 230 V S J T K U...
Page 381: ...Daikin Europe NV 13 4 2 1 2 cm O 4 2 1 50 cm2 4 2 2 A 1 2 70 C a b DHW c d e...
Page 382: ...Daikin Europe NV 14 4 3 EKVK4AA B 4 3 1 4 3 2...
Page 387: ...Daikin Europe NV 19 5 3 1 3 mm 1 2 A 3 1 4 2 5 6 10 2 7 8 5 3 1 X4 6 7 11 12 8 9 6 7...
Page 389: ...Daikin Europe NV 21 RF CH 5 RF CH 2 C rF L RF RF 1 5 4 4 10 1 7 5 5 5 1 1 2 2 3 4 50 mbar 5...
Page 391: ...Daikin Europe NV 23 5 2 CE B23 B33 C13 C33 C43 CLV C53 C63 CE...
Page 398: ...Daikin Europe NV 30 5 5 5 O 1 5 3 250 mm 2000 mm 1000 mm 1 500 mm...
Page 399: ...Daikin Europe NV 31...
Page 405: ...Daikin Europe NV 37 6 3 1 2 3 4 5 6 6 3 1 10 2...
Page 406: ...Daikin Europe NV 38 7 7 1 LED CH bar q 0 Su Et q LED Eco LED LED 8 2 LED 2 LED LED LED 30...
Page 414: ...Daikin Europe NV 46 8 3 8 3 1 7 7 7 8 8 3 2 20 mbar 7 7 7 8 8 3 3 CH 10 1 OpenTherm CH RF 80...
Page 417: ...Daikin Europe NV 49 9 9 1 1 1 2 3 4 5 6 7 1 2 3 8 4 5 6 9 10 11 Allen 12 9 1 2 1 2 3 4 5...
Page 418: ...Daikin Europe NV 50 9 1 3 1 2 O 10 12 Nm 3 4 5 6 1 2 3 A 7 8 9 10 CH 11 12 13 14 7 7 7 8 15 16...
Page 423: ...Daikin Europe NV 55 11 Daikin Europe NV CH...
Page 424: ...008 1548499_04 05 2022 88550712...