![Daikin EKOMBG22ABV1 Installation Instructions Manual Download Page 48](http://html1.mh-extra.com/html/daikin/ekombg22abv1/ekombg22abv1_installation-instructions-manual_3357012048.webp)
Daikin Europe NV
50
9.1.3
Fitting
During maintenance the front plate seal needs to be replaced.
When assembling, check the other seals for damages, hardening,
(hairline) fractures and/or discoloration. Where necessary, place a
new seal. Also check the correct positioning.
1.
Check that between the flange of the shoulder bolt and the front plate, there is a
thin layer of ceramic grease.
If there is no or insufficient grease, it must be applied (see image).
2.
Note:
Replace the seal around the front cover. Clean the seal ring chamber with
a soft brush and make sure the new o-ring is pressed in well all around. Avoid
stretching or tearing. Place the front lid on the heat exchanger and secure it with
the special shoulder bolts (hex key). Make sure that the o-ring remains in place
when installing the front plate. Evenly tighten the shoulder bolts crosswise
manually (10
–
12 Nm). For the sequence of tightening, see image.
3.
Evenly manually tighten the boiler controller bolts crosswise.
4.
Fit the gas coupling under the gas block.
5.
Fit the connector onto the fan and the ignition unit onto the gas block.
6.
Fit the condense outlet tray by sliding it into the outlet stump of the switcher (1), with the
siphon connection, before the bottom tray. Then turn the condense outlet tray to the left (2)
and push it down into the siphon connection (3). Make sure that the rear of the condense
outlet tray ends up resting on the cam at the back of the bottom container (A).
7.
Fill the siphon with water and fit it onto the connection under the condense outlet tray.
8.
Slide the flue gas pipe, while turning it to the left, with its top around the flue gas adapter in
the top lid.
Insert the bottom into the condense outlet tray, drag the gasket down and
tighten the swivel head to the right.
9.
Open the gas valve and check the gas couplings under the gas block and on the assembly
bracket for leakage.
10.
Check the CH and the water pipes for leakage.
11.
Insert the plug into the socket.
12.
Switch the unit on with the button.
13.
Check the front lid, the connection of the fan to the front lid and the flue tube parts for leaks.
14.
Check the gas-air regulation (see par. 7.7 and par. 7.8) and check the gas coupling on the
gas block for gas tightness.
15.
Assemble the cover and tighten the two screws to the left and the right of the display, and
close the display cover.
16.
Check the heating and the hot water provision for correct functioning.
Summary of Contents for EKOMBG22ABV1
Page 29: ...Daikin Europe NV 31...
Page 82: ...Daikin Europe NV 31...
Page 136: ...Daikin Europe NV 32...
Page 189: ...Daikin Europe NV 31...
Page 242: ...Daikin Europe NV 32...
Page 295: ...Daikin Europe NVs GmbH 31...
Page 347: ...Daikin Europe NV 31...
Page 372: ...Daikin Europe NV 4 Daikin EKOMBG22ABV1 EKOMBG28ABV1 EKOMBG33ABV1 CH DHW O...
Page 377: ...Daikin Europe NV 9 3 A CH L B C M D S1 N X4 E S2 O F P S3 G Q H R I 230 V S J T K U...
Page 381: ...Daikin Europe NV 13 4 2 1 2 cm O 4 2 1 50 cm2 4 2 2 A 1 2 70 C a b DHW c d e...
Page 382: ...Daikin Europe NV 14 4 3 EKVK4AA B 4 3 1 4 3 2...
Page 387: ...Daikin Europe NV 19 5 3 1 3 mm 1 2 A 3 1 4 2 5 6 10 2 7 8 5 3 1 X4 6 7 11 12 8 9 6 7...
Page 389: ...Daikin Europe NV 21 RF CH 5 RF CH 2 C rF L RF RF 1 5 4 4 10 1 7 5 5 5 1 1 2 2 3 4 50 mbar 5...
Page 391: ...Daikin Europe NV 23 5 2 CE B23 B33 C13 C33 C43 CLV C53 C63 CE...
Page 398: ...Daikin Europe NV 30 5 5 5 O 1 5 3 250 mm 2000 mm 1000 mm 1 500 mm...
Page 399: ...Daikin Europe NV 31...
Page 405: ...Daikin Europe NV 37 6 3 1 2 3 4 5 6 6 3 1 10 2...
Page 406: ...Daikin Europe NV 38 7 7 1 LED CH bar q 0 Su Et q LED Eco LED LED 8 2 LED 2 LED LED LED 30...
Page 414: ...Daikin Europe NV 46 8 3 8 3 1 7 7 7 8 8 3 2 20 mbar 7 7 7 8 8 3 3 CH 10 1 OpenTherm CH RF 80...
Page 417: ...Daikin Europe NV 49 9 9 1 1 1 2 3 4 5 6 7 1 2 3 8 4 5 6 9 10 11 Allen 12 9 1 2 1 2 3 4 5...
Page 418: ...Daikin Europe NV 50 9 1 3 1 2 O 10 12 Nm 3 4 5 6 1 2 3 A 7 8 9 10 CH 11 12 13 14 7 7 7 8 15 16...
Page 423: ...Daikin Europe NV 55 11 Daikin Europe NV CH...
Page 424: ...008 1548499_04 05 2022 88550712...