Daikin Europe NV
49
9
MAINTENANCE
The unit and the installation must be checked by a certified installer, and cleaned if
necessary.
CAUTION
Work on gas carrying parts may only be carried out by a certified
installer.
After work, check the flue gas carrying parts for air tightness.
If the unit has just been operational, some parts may be hot.
9.1.1
Disassembly
1.
Switch the unit off with the button.
2.
Remove the plug from the socket.
3.
Shut the gas valve.
4.
Open the display valve and loosen the two screws on the left and right of the
display, and remove the front panel.
5.
Wait until the unit has cooled down.
6.
Unscrew the coupling nut at the bottom of the flue tube to the left.
7.
Slide the flue gas pipe upwards (1) with a turn to the left until the bottom of the pipe
reaches above the coupling of the condense outlet container. Pull the bottom of the
pipe forward (2) and remove the pipe by rotating it to the left and down (3).
8.
Lift the condense outlet tray from the connection of the siphon (4) on the left, and
turn it to the right with the siphon connection over the edge of the bottom tray (5).
Push down the condense outlet tray at the back from the connection to the heat
exchanger (6) and remove it from the unit.
9.
Take the connector from the fan and the ignition unit from the gas block.
10.
Disconnect the coupling under the gas block.
11.
Unscrew the shouldered bolts (hex key) of the front lid and remove it to the front,
complete with gas block and fan (be careful not to damage the boiler controller,
insulation plate, gas block, gas pipe and fan). Lay the removed front lid with the foot
rests horizontally on a flat surface.
12.
The boiler controller and the integrated insulation plate do not require any
maintenance (do not need cleaning). Therefore never use a brush or compressed
air to clean these parts, in order to avoid dust developing.
9.1.2
Cleaning
1.
Clean the heat exchanger with a brush or vacuum cleaner, from top to bottom.
2.
Clean the bottom of the heat exchanger.
3.
Clean the condense outlet tray with water.
4.
Clean the siphon with water.
5.
Clean the inside and bottom of the front plate with a soft brush.
CAUTION
The
ï
ntegrated insulation plate and
boiler controller
gasket
contain ceramic fibers.
Summary of Contents for EKOMBG22ABV1
Page 29: ...Daikin Europe NV 31...
Page 82: ...Daikin Europe NV 31...
Page 136: ...Daikin Europe NV 32...
Page 189: ...Daikin Europe NV 31...
Page 242: ...Daikin Europe NV 32...
Page 295: ...Daikin Europe NVs GmbH 31...
Page 347: ...Daikin Europe NV 31...
Page 372: ...Daikin Europe NV 4 Daikin EKOMBG22ABV1 EKOMBG28ABV1 EKOMBG33ABV1 CH DHW O...
Page 377: ...Daikin Europe NV 9 3 A CH L B C M D S1 N X4 E S2 O F P S3 G Q H R I 230 V S J T K U...
Page 381: ...Daikin Europe NV 13 4 2 1 2 cm O 4 2 1 50 cm2 4 2 2 A 1 2 70 C a b DHW c d e...
Page 382: ...Daikin Europe NV 14 4 3 EKVK4AA B 4 3 1 4 3 2...
Page 387: ...Daikin Europe NV 19 5 3 1 3 mm 1 2 A 3 1 4 2 5 6 10 2 7 8 5 3 1 X4 6 7 11 12 8 9 6 7...
Page 389: ...Daikin Europe NV 21 RF CH 5 RF CH 2 C rF L RF RF 1 5 4 4 10 1 7 5 5 5 1 1 2 2 3 4 50 mbar 5...
Page 391: ...Daikin Europe NV 23 5 2 CE B23 B33 C13 C33 C43 CLV C53 C63 CE...
Page 398: ...Daikin Europe NV 30 5 5 5 O 1 5 3 250 mm 2000 mm 1000 mm 1 500 mm...
Page 399: ...Daikin Europe NV 31...
Page 405: ...Daikin Europe NV 37 6 3 1 2 3 4 5 6 6 3 1 10 2...
Page 406: ...Daikin Europe NV 38 7 7 1 LED CH bar q 0 Su Et q LED Eco LED LED 8 2 LED 2 LED LED LED 30...
Page 414: ...Daikin Europe NV 46 8 3 8 3 1 7 7 7 8 8 3 2 20 mbar 7 7 7 8 8 3 3 CH 10 1 OpenTherm CH RF 80...
Page 417: ...Daikin Europe NV 49 9 9 1 1 1 2 3 4 5 6 7 1 2 3 8 4 5 6 9 10 11 Allen 12 9 1 2 1 2 3 4 5...
Page 418: ...Daikin Europe NV 50 9 1 3 1 2 O 10 12 Nm 3 4 5 6 1 2 3 A 7 8 9 10 CH 11 12 13 14 7 7 7 8 15 16...
Page 423: ...Daikin Europe NV 55 11 Daikin Europe NV CH...
Page 424: ...008 1548499_04 05 2022 88550712...