
36
Installation Manual
Rev. 2.00
Date 01-2019
COMMISSIONING STEPS
TURN ON POWER TO ALL SYSTEM
Wired and Wireless Thermostats.
Verify that the first configuration
screen is displayed.
DZK Control Board.
Verify that the LEDs status is correct.
Note:
when configuring the
system, the opening LEDs of the
actuator control outputs will turn
on sequentially as the system
checks proper functioning.
Meaning
D1
Data reception from BACnet interface connector
Blinking
Green
D2
Data transmission from BACnet interface connector
Blinking
Red
D3
Main control board internal bus activity
Blinking
Green
D4
Data transmission from DZK connection bus
Blinking
Red
D5
Data reception from DZK connection bus
Blinking
Green
D11
Main control board power
Solid
Red
Opening damper
On
Green
Closing damper
On
Red
Summary of Contents for DZK Series
Page 1: ...Installation Manual Zoning Kit ...
Page 26: ...26 Installation Manual Rev 2 00 Date 01 2019 Wired Thermostat Wireless Thermostat ...
Page 46: ...46 Installation Manual Rev 2 00 Date 01 2019 WIRELESS THERMOSTAT NAVIGATION GUIDE ...
Page 54: ...54 Installation Manual Rev 2 00 Date 01 2019 WIRING DIAGRAM ...
Page 55: ......
Page 56: ...Phone 855 770 5678 http www daikinac com 400886 ...