7
|
Unit installation
Installer reference guide
82
08CA + EHY EHYHBH/X08A + EHYKOMB33AA
Daikin Altherma hybrid heat pump
4P355634-1G – 2022.09
7.7.1 Internal connections
If possible, the condensate drain pipe should be routed and terminated so that the
condensate drains away from the boiler under gravity to a suitable internal foul
water discharge point such as an internal soil and vent stack. A suitable permanent
connection to the foul waste pipe should be used.
Ø22 mm
a
b
c
a
Condensate discharge from boiler
b
Soil and vent stack
c
Minimum 450 mm and up to 3 storeys
If the first option is NOT possible, an internal kitchen or bathroom waste pipe,
washing machine pipe can be used. Make sure that the condensate drain pipe is
connected downstream of the waste trap.
a
b
c
d
≥75 mm
Ø22 mm
100 mm
a
Condensate discharge from boiler
b
Soil and vent stack
c
Sink or basin with integrated overflow
d
75 mm waste trap and air break
Condensate pump
Where gravity discharge to an internal termination is NOT physically possible or
where very long internal runs of drainage pipe would be required to reach a
suitable discharge point, condensate should be removed by using a proprietary
condensate pump (field supply).
The pump outlet pipe should discharge to a suitable internal foul water discharge
point such as an internal soil and vent stack, internal kitchen, bathroom waste
pipe, or washing machine waste pipe. A suitable permanent connection to the foul
waste pipe should be used.
Summary of Contents for Altherma EHYHBH05A Series
Page 261: ......
Page 262: ......
Page 263: ......
Page 264: ...4P355634 1G 2022 09 Copyright 2013 Daikin Verantwortung f r Energie und Umwelt...