7
|
Unit installation
Installer reference guide
54
08CA + EHY EHYHBH/X08A + EHYKOMB33AA
Daikin Altherma hybrid heat pump
4P355634-1G – 2022.09
6
6
7
8
7.2.4 To open the gas boiler
1
2
2
1
Open the display cover.
2
Unscrew both screws.
3
Tilt the front panel towards you and remove the front panel.
7.2.5 To open the switch box cover of the gas boiler
1
"7.2.4 To open the gas boiler"
54].
2
Pull the boiler controller unit forwards. The boiler controller will tip
downwards to provide access.
Summary of Contents for Altherma EHYHBH05A Series
Page 261: ......
Page 262: ......
Page 263: ......
Page 264: ...4P355634 1G 2022 09 Copyright 2013 Daikin Verantwortung f r Energie und Umwelt...