12
|
Commissioning
Installer reference guide
202
08CA + EHY EHYHBH/X08A + EHYKOMB33AA
Daikin Altherma hybrid heat pump
4P355634-1G – 2022.09
NOTICE
To perform an underfloor heating screed dryout, room frost protection needs to be
disabled ([2‑06]=0). By default, it is enabled ([2‑06]=1). However, due to the
"installer-on-site" mode (see "Commissioning"), room frost protection will be
automatically disabled for 36 hours after the first power-on.
If the screed dryout still needs to be performed after the first 36 hours of power-on,
manually disable room frost protection by setting [2‑06] to "0", and KEEP it disabled
until the screed dryout has finished. Ignoring this notice will result in cracking of the
screed.
NOTICE
For the underfloor heating screed dryout to be able to start, make sure the following
settings are met:
▪
[4‑00]=1
▪
[C‑02]=0
▪
[D‑01]=0
▪
[4‑08]=0
▪
[4‑01]≠1
The installer can program up to 20 steps. For each step he needs to enter:
1
the duration in hours, up to 72 hours,
2
the desired leaving water temperature, up to 55°C.
Example:
t
T
A1
25°C (1)
35°C (2)
24h (1)
36h (2)
T
Desired leaving water temperature (15~55°C)
t
Duration (1~72 h)
(1)
Action step 1
(2)
Action step 2
To program an underfloor heating screed dryout schedule
1
Set the user permission level to Installer. See
"To set the user permission level
131].
2
Go to [A.7.2]:
>
Installer settings
>
Commissioning
>
UFH
screed dryout
>
Set dryout schedule
.
3
Use the , , , and to program the schedule.
▪
Use and to scroll through the schedule.
▪
Use and to adjust the selection.
If a time is selected, you can set the duration between 1 and 72 hours.
If a temperature is selected, you can set the desired leaving water
temperature between 15°C and 55°C.
4
To add a new step, select "–h" or "–" on an empty line and press .
5
To delete a step, set the duration to "–" by pressing .
6
Press to save the schedule.