7
|
Unit installation
Installer reference guide
57
08CA + EHY EHYHBH/X08A + EHYKOMB33AA
Daikin Altherma hybrid heat pump
4P355634-1G – 2022.09
Typical workflow
Mounting the outdoor unit typically consists of the following stages:
1
Providing the installation structure.
2
Installing the outdoor unit.
3
Providing drainage.
4
Protecting the unit against snow and wind by installing a snow cover and baffle
plates. See
"7.1 Preparing the installation site"
48].
7.3.2 Precautions when mounting the outdoor unit
INFORMATION
Also read the precautions and requirements in the following chapters:
▪
"3 General safety precautions"
▪
"7.1 Preparing the installation site"
7.3.3 To provide the installation structure
Check the strength and level of the installation ground so that the unit will not
cause any operating vibration or noise.
Fix the unit securely by means of foundation bolts in accordance with the
foundation drawing.
If the unit is installed directly on the floor, prepare 4 sets of M8 or M10 anchor
bolts, nuts and washers (field supply) as follows:
INFORMATION
The maximum height of the upper protruding part of the bolts is 15 mm.
283
580
<100
(mm)
<100
>300
In any case, provide at least 300 mm of free space below the unit. Additionally,
make sure the unit is positioned at least 100 mm above the maximum expected
level of snow. In this case, it is recommended to construct a pedestal, and on this
pedestal install the EKFT008CA option kit.
Summary of Contents for Altherma EHYHBH05A Series
Page 261: ......
Page 262: ......
Page 263: ......
Page 264: ...4P355634 1G 2022 09 Copyright 2013 Daikin Verantwortung f r Energie und Umwelt...