9 Installation
Installer reference guide
55
EJHA EHY32AA
Daikin Altherma Hybrid hydrosplit heat pump
4P531180-1 – 2018.06
9.10
Finishing the outdoor unit
installation
9.10.1
To close the outdoor unit
NOTICE
When closing the outdoor unit cover, make sure that the
tightening torque does NOT exceed 4.1 N•m.
2×
2×
2
4×
1
2×
3
1
Reattach the rear plate.
2
Reattach the front plate.
3
Reattach the top plate.
9.11
Finishing the gas boiler
installation
9.11.1
To perform an air purge on the gas supply
1
Turn once the screw counterclockwise.
Result:
Gas supply will purge air.
2
Check all connections for leakage.
3
Check the gas supply pressure.
INFORMATION
Make sure the working inlet pressure does NOT interfere
with other gas appliances installed.
9.11.2
To close the gas boiler
1
Hook the top of the front panel into the top of the gas boiler.
2
Tilt the bottom side of the front panel towards the gas boiler.
3
Screw both screws of the cover.
4
Close the display cover.
9.11.3
To install the cover plate
The boiler cover plate is an optional product.