9 Installation
Installer reference guide
32
EJHA EHY32AA
Daikin Altherma Hybrid hydrosplit heat pump
4P531180-1 – 2018.06
Anchor points
574
311
4× M8/M10
(mm)
Option 1: On mounting feet "flexi-foot with strut"
(mm)
<150
a
>300
311
574
>100
a
Maximum snowfall height
Option 2: On plastic mounting feet
574
311
Option 3: On a pedestal
574
311
<100
>300
(mm)
Option 4: On brackets to the wall
(mm)
>300
a
4×
a
Anti-vibration rubber (field supply)
9.3.4
To install the outdoor unit
4× M8/M10
9.3.5
To provide drainage
▪ Make sure that condensation water can be evacuated properly.
▪ Install the unit on a base to make sure that there is proper
drainage in order to avoid ice accumulation.
▪ Prepare a water drainage channel around the foundation to drain
waste water away from the unit.
▪ Avoid drain water flowing over the footpath, so that it does NOT
become slippery in case of ambient freezing temperatures.
▪ If you install the unit on a frame, install a waterproof plate within
150 mm of the bottom side of the unit in order to prevent water
from getting into the unit and to avoid drain water dripping (see the
following figure).