ANCHORING THE MOTOR
It is very important that the motor is mounted on a firm foundation that can not move or become loose over time. the foundation
should be constructed from concrete. The size of the plinth should be about 300 by 300 mm square and about 200mm deep. The
foundation plate supplied with the motor must be securely mounted to the concrete using coach screws and plugs. The foundation
plate can also be welded to the gate rail if need be. The concrete should be allowed sufficient time to set before the motor is mounted
onto the plate.
Allow concrete to set and then place the founda-
tion plate onto the concrete plinth
3
Foundation plate
Place concrete plinth here
Place concrete plinth here
For a gate closing to the right
For a gate closing to the left
2
Place the conduit in the correct position before filling the hole with
concrete. Flexible conduit may also be used.
4
Trim the conduit and the cable to the correct length before
placing the motor onto the foundation plate.
Use 12mm coach screws to
mount the foundation plate to the
concrete
Dig a hole about 300mm square
1
80 mm
80 mm
Top view
Foundation plate
Gate
Side view
Foundation plate
Measure 80 mm from the edge of the gate to the first bolt on the left hand side of the foundation plate
Summary of Contents for Compact
Page 12: ......