When anchoring the motor it is important to ensure that the following points are checked.
1.
The electrical cable is in place.
2.
The concrete is fully set.
3.
The motor foundation mountings are secure and can not move or become loose.
4.
The motor should be set level and parallel to the gate.
5.
The motor must be set above the flood level or if this is not possible, a flood proof wall should be constructed around the
motor.
After placing the motor
onto the three jack-up
bolts, place the three
clamping nuts over the
bolts to clamp the motor in
place.
Top view
Gate in fully closed position
Anti-lift device and
Rollers
P.C.B.
Conduit
Concrete plinth
12mm coach screws in plugs
P.C. Board
Jack-up nuts for adjust-
ing the motor height.
Side view
Ensure that the motor is mounted level
SECURING THE MOTOR TO THE FOUNDATION PLATE
Summary of Contents for Compact
Page 12: ......