3
CUES Inc.
,
MPlus+ User Manual | CH905
23
www.cuesinc.com
,
SET-UP & INSTALLATION
CONNECTING THE COILER TO THE PCU -
STANDARD OR XL VERSION
The coiler and AC connections are located on the
side of the control unit.
Attach the interconnect cable, P/N CH070, from
the coiler to the control unit as shown.
Connect the AC power cord to the control
unit as shown.
Confirm the Battery “Charging” Yellow
Light or “Charged” Green Light indication
appears on control unit.