4
18
CUES Inc.
,
LAMPII User Manual | LM903
www.cuesinc.com
,
SYSTEM SET-UP & INSTALLATION
1. All chutes are fastened with (4) screws (in
RED
below) using a Phillips Head screwdriver.
2. Once fastened in place, the large pipe chutes, P/N LM362 or LM363, will be ready to
receive the tube, P/N LM297, for the appropriate pipe size to be inspected.
3. Slide the tube into the breech of the chute, aligning the hole in the tube with the pull ring
of the pin while pulling it and releasing it when the tube has reached the bottom. Turn the
tube until the detent is heard.
4. When using the large 14” diameter wheels: In order to avoid flipping over, place the
wheels with the thinner spacer on the front axle of the unit.
NOTE: Refer to the Wheel Matrix in this manual for the appropriate chute to use.
NOTE: The (4) screws and locations (in
RED
below) are the same for each configuration.
TO INSTALL THE CHUTE AND WHEELS PER P/N LM931-INST -
The other screw
is located on the
side of the unit.
The other screw
is located on the
side of the unit.