
98
X. Operation
F. Changing Adjustable Parameters (continued)
“Press”
Contractor
Setup
button to access the following parameters:
Factory Setting
Range / Choices
Parameter and Description
Contractor Name
User defined
Contractor Name
Address Line 1
User defined
Contractor Address Line 1
Address Line 2
User defined
Contractor Address Line 2
Phone
User defined
Contractor Phone
Use Up and DOWN Arrows for More
Exit Screen without Saving
Clear Entire Field
Backspace
Save Field and Exit
Save
Press box to input contractor information.
Contractor Name
<
>
i
Bill Smith
1
7
6
5
4
3
2
A
ES
C
D
C
B
8
CL
R
7
BS
8
Enter Contractor Information
Bill Smith
Press SAVE button to store revisions.
For Service Contact:
Bill Smith
12 Victory Lane
Plainview, New York
516 123-4567
Example Screen
“Press”
Manual
Control
button to access the following screen:
The Manual Speed Control speed screen allows the technician to set firing rate at low or high speed for combustion testing.
NOTE
Selecting “Low” or “High”
locks (manual mode) firing
rate at min or max Rate %.
After combustion testing select
“Auto” to return the boiler to
normal operation.
NOTE
Rate % can only be set
when the boiler has heat
demand and is released to
modulate.
Press “Auto” to
return firing rate
to Automatic
Mode
“Press” “High” to select
manual firing rate control
and Central Heat Maximum
firing rate %
“Press” “Low” to select
manual firing rate control
and Minimum firing rate %
Summary of Contents for Phantom X series
Page 14: ...14 III Pre Installation and Boiler Mounting G General continued Figure 5 Boiler Stacking...
Page 47: ...47 VI Water Piping and Trim continued Figure 28 Near Boiler Piping Heating Only...
Page 71: ...71 IX System Start up continued Figure 47 Operating Instructions...
Page 122: ...122 XIII Repair Parts continued...
Page 126: ...126 XIII Repair Parts continued...
Page 129: ...129 XIII Repair Parts continued 10A 10B 10C 10D 10G...
Page 134: ...134...
Page 135: ...135...