
5
TABLE OF CONTENTS
I.
Product Description, Specifications and Dimensional Data......................
6
II.
Unpacking Boiler........................................................................................ 9
III. Pre-Installation and Boiler Mounting.......................................................... 10
IV. Venting...................................................................................................... 15
A. General Guidelines............................................................................... 15
B. CPVC/PVC Venting.............................................................................. 22
C. Polypropylene Venting......................................................................... 27
D. Stainless Steel Venting........................................................................ 32
E. Optional Room Air for Combustion.......................................................
34
F. Removing the Existing Boiler...............................................................
35
G. Multiple Boiler Installation Venting....................................................... 36
V.
Condensate Disposal................................................................................. 39
VI. Water Piping and Trim............................................................................... 41
VII. Gas Piping ............................................................................................... 53
VIII. Electrical ................................................................................................... 58
IX. System Start-Up ....................................................................................... 70
X. Operation...................................................................................................... 78
A. Overview.............................................................................................. 78
B. Supply Water Temperature Regulation................................................ 79
C. Boiler Protection Features.................................................................... 80
D. Multiple Boiler Control Sequencer........................................................ 81
E. Boiler Sequence of Operation.............................................................. 83
1. Normal Operation............................................................................ 83
2. Using the Display............................................................................
84
3. Status Screens............................................................................... 85
4. Detail Screens................................................................................. 87
5. Multiple Boiler Sequencer Screens................................................ 88
F. Changing Adjustable Parameters.........................................................
89
1. Entering Adjust Mode..................................................................... 89
2. Adjusting Parameters...................................................................... 89
XI. Service and Maintenance ........................................................................ 108
XII.
Troubleshooting........................................................................................
114
XIII. Repair Parts ............................................................................................. 120
Appendix A - Instructions for High altitude Installations Above 2000 ft.....
131
Summary of Contents for Phantom X series
Page 14: ...14 III Pre Installation and Boiler Mounting G General continued Figure 5 Boiler Stacking...
Page 47: ...47 VI Water Piping and Trim continued Figure 28 Near Boiler Piping Heating Only...
Page 71: ...71 IX System Start up continued Figure 47 Operating Instructions...
Page 122: ...122 XIII Repair Parts continued...
Page 126: ...126 XIII Repair Parts continued...
Page 129: ...129 XIII Repair Parts continued 10A 10B 10C 10D 10G...
Page 134: ...134...
Page 135: ...135...