
20
IV. Venting
A. General Guidelines (continued)
Figure 8: Direct Vent - Sidewall Snorkel Terminations
Figure 9: Direct Vent - Sidewall Low Profile Termination
ii.
Vertical Roof Venting: Use coupling on vent
and two 90° elbows turned downwards for
combustion air as shown in Figure 10 and
Figure 11.
b. Maintain correct clearance and orientation
between vent and combustion air terminals.
i.
Space centerlines of vent and combustion air
terminals minimum 12 in. (300 mm) apart.
36 in. (915 mm) spacing is recommended.
ii.
If possible, locate vent and combustion
air terminals on the same wall to prevent
nuisance shutdowns. If not, boiler may
be installed with roof vent terminal and
sidewall combustion air terminal.
iii.
When installed on the same wall, locate
vent terminal at same height or higher than
combustion air terminal.
c. Locate bottom of vent and combustion air
terminals at least 12 in. (300 mm) [18 in.
(460 mm) in Canada] above the normal snow line
and at least 12 in. (300 mm) above grade level.
d. Locate vent and combustion air terminals at
least 12 in. (300 mm) from any door, window, or
gravity inlet into the building.
e. Do not install vent terminal directly above
windows or doors.
Summary of Contents for Phantom X series
Page 14: ...14 III Pre Installation and Boiler Mounting G General continued Figure 5 Boiler Stacking...
Page 47: ...47 VI Water Piping and Trim continued Figure 28 Near Boiler Piping Heating Only...
Page 71: ...71 IX System Start up continued Figure 47 Operating Instructions...
Page 122: ...122 XIII Repair Parts continued...
Page 126: ...126 XIII Repair Parts continued...
Page 129: ...129 XIII Repair Parts continued 10A 10B 10C 10D 10G...
Page 134: ...134...
Page 135: ...135...