
7
5
Table 3: Minimum Room Volumes Based On Sixteen Times Boiler Volume By Model Size
Bo ile r
M o d e l
O v e r A ll
L e n g t h
J a c k e t
O v e r A ll
De p t h
J a c k e t
O v e r A ll
He ig h t
Flo o r T o
T o p O f
J a c k e t
Bo ile r
V o lu m e
( Ft 3 )
M in im u m
Ro o m
V o lu m e
( Ft 3 )
1 6 - 3 2 5
2 3 3 /4
3 2 7 /1 6
3 2 1 /2
1 4 .5
2 3 1 .8
1 6 - 3 9 0
2 7 1 /2
3 2 7 /1 6
3 2 1 /2
1 6 .8
2 6 8 .4
1 6 - 4 5 5
3 1 1 /4
3 2 7 /1 6
3 2 1 /2
1 9 .1
3 0 5 .0
1 6 - 5 2 0
3 5
3 2 7 /1 6
3 2 1 /2
2 1 .4
3 4 1 .6
1 6 - 5 8 5
3 8 3 /4
3 2 7 /1 6
3 2 1 /2
2 3 .6
3 7 8 .2
Summary of Contents for 16 Series and
Page 2: ...2...
Page 4: ...4 2 II Specifications...
Page 12: ...12 10 Figure 6 Jacket Assembly...
Page 13: ...13 11 Figure 7 Gas Train Standard Build Figure 8 Gas Train CSD 1 Build 16 455 16 520 16 585...
Page 18: ...18 16 Figure 14 All Air From Outdoors Using Horizontal Ducts Into The Boiler Room...
Page 25: ...25 23 Figure 18 Standard Boiler Piping...
Page 26: ...26 Figure 19 Recommended Piping for Combination Heating Cooling Refrigeration System 24...
Page 30: ...30 28 Figure 21 Series 16 Standard Boiler Wiring...
Page 31: ...31 29 Figure 22 Series 16 CSD 1 Boiler Wiring...
Page 40: ...40 Figure 26 Exploded View Base Parts Manifold 38...
Page 42: ...42 Figure 27 Exploded View Base Heat Exchanger Flue Collector Assembly 40...
Page 44: ...44 42 Figure 28 Exploded View Jacket...
Page 46: ...46 44 Figure 29 Exploded View Trim Control Components...