35
Figure 25: Gas Valve Detail - Robertshaw 7000DERHC
33
14) Test thermostat operation while the boiler is running. Turn the thermostat to the lowest setting. Both pilot
burner and main burners should stop firing and the vent damper (if used) should close. Raise the thermostat back
to the highest setting. The vent damper (if used) should open and the pilot burner and main burners should relight.
15) Verify high limit operation. Allow the boiler water temperature to increase to high limit setting. The burners
should shut down, the circulator continues running and the vent damper (if used) closes. Allow the boiler water
temperature to drop below high limit setting. The vent damper (if used) should open and the pilot burner and main
burners should relight.
16) Inspect the vent system for flue gas leaks. Repair any leaks found before leaving the boiler in operation.
17) After the boiler has operated for approximately 30 minutes, check the boiler and heating system piping for leaks.
Repair any leaks found at once.
18) Review the “USER’S INFORMATION MANUAL” and system operation with the owner or operator.
Summary of Contents for 16 Series and
Page 2: ...2...
Page 4: ...4 2 II Specifications...
Page 12: ...12 10 Figure 6 Jacket Assembly...
Page 13: ...13 11 Figure 7 Gas Train Standard Build Figure 8 Gas Train CSD 1 Build 16 455 16 520 16 585...
Page 18: ...18 16 Figure 14 All Air From Outdoors Using Horizontal Ducts Into The Boiler Room...
Page 25: ...25 23 Figure 18 Standard Boiler Piping...
Page 26: ...26 Figure 19 Recommended Piping for Combination Heating Cooling Refrigeration System 24...
Page 30: ...30 28 Figure 21 Series 16 Standard Boiler Wiring...
Page 31: ...31 29 Figure 22 Series 16 CSD 1 Boiler Wiring...
Page 40: ...40 Figure 26 Exploded View Base Parts Manifold 38...
Page 42: ...42 Figure 27 Exploded View Base Heat Exchanger Flue Collector Assembly 40...
Page 44: ...44 42 Figure 28 Exploded View Jacket...
Page 46: ...46 44 Figure 29 Exploded View Trim Control Components...