F. Control & Trim Installation
1) Table 4 shows the use of all tappings on Series 16 boilers. The tapping letter designations referenced are
shown in Figure 4. Control and trim components are as follows:
a. 4 x 4 Junction Box - Install the supplied junction box on the inside of right jacket side panel with two
8-32 x 1/2” machine screws and nuts. See Figure 6.
b. R8285D Control Center is to be mounted to the 4 x 4 junction box. Refer to Section X for complete
wiring instructions.
c. Temperature-Pressure Gauge - Install the T&P gauge in tapping “H”. Tapping “H” is located on the
supplied 2” NPT x 10” supply nipple (See Figure 9). DO NOT TIGHTEN THE GAUGE BY ITS
CASE.
d. L4080D Operating Limit Control - Insert the bulb of the control into the well until it rests against the
bottom of the well. Bend the tubing if necessary to provide enough force to hold the bulb against the
bottom of the well. Avoid making a sharp bend in the tubing as this can cause the control to malfunc-
tion. Tighten the screw on the bottom of the control so that it is securely clamped onto the well.
12
Figure 9: Temperature-Pressure Gauge Installation
Summary of Contents for 16 Series and
Page 2: ...2...
Page 4: ...4 2 II Specifications...
Page 12: ...12 10 Figure 6 Jacket Assembly...
Page 13: ...13 11 Figure 7 Gas Train Standard Build Figure 8 Gas Train CSD 1 Build 16 455 16 520 16 585...
Page 18: ...18 16 Figure 14 All Air From Outdoors Using Horizontal Ducts Into The Boiler Room...
Page 25: ...25 23 Figure 18 Standard Boiler Piping...
Page 26: ...26 Figure 19 Recommended Piping for Combination Heating Cooling Refrigeration System 24...
Page 30: ...30 28 Figure 21 Series 16 Standard Boiler Wiring...
Page 31: ...31 29 Figure 22 Series 16 CSD 1 Boiler Wiring...
Page 40: ...40 Figure 26 Exploded View Base Parts Manifold 38...
Page 42: ...42 Figure 27 Exploded View Base Heat Exchanger Flue Collector Assembly 40...
Page 44: ...44 42 Figure 28 Exploded View Jacket...
Page 46: ...46 44 Figure 29 Exploded View Trim Control Components...