32
Safety Control Operation
Temperature Limit Control – The temperature limit control interrupts burner operation when the supply water tempera-
ture exceeds the set point. Maximum allowable water temperature in a water boiler is 250F. The L4080D will reset itself
when the water temperature drops below the set point less the differential (typically 15F). The circulator will continue
to operate for as long as the thermostat or operating control calls for heat. If a vent damper is installed, it will close
when the high limit opens. Manual reset water limit controls, such as the Honeywell L4006E, must be manually reset.
For this reason, they should be set well above the operating limit control to avoid nuisance boiler shutdowns.
Blocked Vent Switch - The blocked vent switch automatically interrupts main burner operation when flue gas spillage,
caused by a complete vent blockage, occurs. The circulator continues to operate and the vent damper (if used) remains
open with a call for heat. If the blocked vent switch is activated, do not attempt to place the boiler in operation. Correct
the cause of the spillage and reset the blocked vent switch.
Flame Roll-out Switch - The flame roll-out switch automatically interrupts main burner operation when flames or
excessive heat are present in the vestibule. The circulator continues to operate and the vent damper (if used) remains
open with a call for heat. This control is a single use device. If the flame roll-out switch is activated, do not attempt to
place the boiler in operation. Correct the cause of the spillage and replace the flame roll-out switch.
Low Water Cut-off (by others) – Low water cut-offs interrupt burner operation if the water level in the boiler drops
below a safe level. See the manufacturer’s instructions for further details on the operation of this safety control.
30
Summary of Contents for 16 Series and
Page 2: ...2...
Page 4: ...4 2 II Specifications...
Page 12: ...12 10 Figure 6 Jacket Assembly...
Page 13: ...13 11 Figure 7 Gas Train Standard Build Figure 8 Gas Train CSD 1 Build 16 455 16 520 16 585...
Page 18: ...18 16 Figure 14 All Air From Outdoors Using Horizontal Ducts Into The Boiler Room...
Page 25: ...25 23 Figure 18 Standard Boiler Piping...
Page 26: ...26 Figure 19 Recommended Piping for Combination Heating Cooling Refrigeration System 24...
Page 30: ...30 28 Figure 21 Series 16 Standard Boiler Wiring...
Page 31: ...31 29 Figure 22 Series 16 CSD 1 Boiler Wiring...
Page 40: ...40 Figure 26 Exploded View Base Parts Manifold 38...
Page 42: ...42 Figure 27 Exploded View Base Heat Exchanger Flue Collector Assembly 40...
Page 44: ...44 42 Figure 28 Exploded View Jacket...
Page 46: ...46 44 Figure 29 Exploded View Trim Control Components...