Figure 2: Minimum Clearances to Combustibles
4
All Models - The following service clearances are recommended from the top and front of the boilers:
16-325, 16-390 – 24 inches
16-455, 16-520, 16-585 – 48 inches
These clearances may be reduced to those shown in Table 2, however servicing the boiler will become increas-
ingly difficult as these service clearances are reduced.
3) The boiler must be installed on a hard level surface.
4) Do not install this boiler in a location where gasoline or other flammable vapors or liquids will be stored or used.
Do not install this boiler in an area where large amounts of airborne dust will be present, such as a workshop.
5) The boiler should be located as close to the chimney as possible.
6) Do not install this boiler directly on a surface that may get wet. Raise the boiler on a pad.
Table 2: Minimum Clearances From Boiler To Combustible Material (inches)
Boiler Model
Front
Top
Sides
Rear
16-325 & 16-390
18
36
6
6
16-455, 16-520, 16-585
18
51-1/2
6
6
Clearance between adjacent Series 16 boilers in modular or multiple boiler installation = 1”
Summary of Contents for 16 Series and
Page 2: ...2...
Page 4: ...4 2 II Specifications...
Page 12: ...12 10 Figure 6 Jacket Assembly...
Page 13: ...13 11 Figure 7 Gas Train Standard Build Figure 8 Gas Train CSD 1 Build 16 455 16 520 16 585...
Page 18: ...18 16 Figure 14 All Air From Outdoors Using Horizontal Ducts Into The Boiler Room...
Page 25: ...25 23 Figure 18 Standard Boiler Piping...
Page 26: ...26 Figure 19 Recommended Piping for Combination Heating Cooling Refrigeration System 24...
Page 30: ...30 28 Figure 21 Series 16 Standard Boiler Wiring...
Page 31: ...31 29 Figure 22 Series 16 CSD 1 Boiler Wiring...
Page 40: ...40 Figure 26 Exploded View Base Parts Manifold 38...
Page 42: ...42 Figure 27 Exploded View Base Heat Exchanger Flue Collector Assembly 40...
Page 44: ...44 42 Figure 28 Exploded View Jacket...
Page 46: ...46 44 Figure 29 Exploded View Trim Control Components...