Assembly
NORTHBRIDGE WITH TENT
19949-100 Rev C (05-18)
© Copyright 2016, Creative Playthings
Page 9
ASSEMBLY INSTRUCTIONS
STEP 1 – Platform Frame:
Locate the Ladder Platform End (S),
Stair Platform End (T), and the two In-
side Beams (R). Lay them out as shown
at right. Orient the Inside Beams with the
larger holes nearer the bottom. Orient the
Platform Ends so the holes in the ends of
the boards are near the top. Make sure
the other holes in the Platform Ends are
aligned as shown.
Use four 5/16 x 4-1/2" Lag Screws with
four 5/16" Flat Washers to fasten each
Platform End to the end of the Inside
Beams.
STEP 2 – Main Beam & Posts:
Fasten the center of one Main Beam (AD) and Center Block (Q) to the front of the Inside Beam using two 5/16 x 6" Hex Bolt
Assemblies*.
Repeat with the other Main Beam and Center Block at the back of the platform frame.
Fasten one Post (AJ) to the Main Beam and platform frame at all four corners. Use 3/8 x 6" Hex Bolt Assemblies in the
lowest holes, 5/16 x 6" Hex Bolt Assemblies in the middle holes and 3/8 x 4-1/2" Hex Bolt Assemblies in the top holes. Do
not fully tighten these fasteners until after installing the legs of the tower in later steps.
Larger hole
on bottom
Align with end
hole at the top
Larger hole
on bottom
Tent Roof Version
5/16 x 6" Hex Bolt
5/16 x 6" Hex Bolt
3/8 x 4-1/2" Hex Bolt
5/16 x 4-1/2"
Lag Screw
3/8 x 6" Hex Bolt
R
R
T
S
AD
AJ
AJ
AD
Q
* Note: a Hex Bolt Assembly consists of one Hex
Bolt passing through one Lock Washer and one Flat
Washer, threaded into one Weld Nut.
Back of the Gym
Right side of the Gym