STEP 23 – Platform Boards:

Lay the Deck Boards (D) and Center Deck Board (E) across 

the Stringers and Inside Beams in the pattern shown at right. 

Push the outer-most Deck Boards tight against the Posts. 

Space the other Boards evenly between the outer-most 

Boards. Make sure the holes in the Center Deck Board align 

with the holes in the Swivel Stringer. Secure the Boards us-

ing #8 x 1-5/8" Screws in each small hole. Do not use screws 

in the larger holes in the Center Deck Board.
Place one End Deck Board (F) so it 

overhangs the Stair 

Platform  End  by  1/4"

. Evenly space another End Deck 

Board between the first and the adjacent Deck Board. Se

-

cure the End Deck Boards using #8 x 1-5/8" Screws in each 

small hole.
Repeat with the remaining End Deck Boards at the other 

end of the platform, 

overhanging the Ladder Platform End 

1/4".

STEP 21 – Secure Rungs:

Secure the Rungs using #10 x 2-1/2" Self-Drilling Screws 

through the pre-drilled holes from below. Drill the Screws up 

through the steel pipe until the head of the screw is flush with 

the surface of the wood.

STEP 22 – Stringers:

Fasten the Stringer (AF) to each Platform End in the position 

shown using one 5/16 x 4" Lag Screw and Flat Washer in 

each end. The wide surface of the Stringer should be flush 

with the top of the Platform Ends.
Fasten the Swivel Stringer (AG) to each Platform End in 

the position shown using one 5/16 x 4" Lag Screw and Flat 

Washer in each end. The wide surface of the Stringer should 

be flush with the top of the Platform Ends.

AF

AG

E

D

D

D

D

D

D

D

D

F

F

F

F

Front of 

the Gym

Parts omitted 

for clarity.

1/4" Overhang

#10 x 2-1/2" Self-

Drilling Screw

5/16 x 4" Lag Screw

Summary of Contents for NORTHBRIDGE W/ TENT

Page 1: ...care to design its products with your child s safety in mind However only with careful supervision and proper safety instructions can you be assured of safe play time on any product designed for child...

Page 2: ...ectrical devices or bird feeders etc Suspended ropes chains and cables must be secured at both ends Suspended ropes chains and cables must not be capable of looping back on themselves Do not allow mor...

Page 3: ...t to lean or rack This leaning puts additional stress on all connections and joints and in time will cause those connections to loosen and fail The Safe Play Area must be free of all structures landsc...

Page 4: ...w 10 x 2 1 2 Self Drill Screw 8mm Flat Washer 1 4 x 1 1 2 Lag Screw 1 4 Lock Washer 1 4 Weld Nut 1 4 x 1 1 2 Hex Bolt 5 16 Flat Washer 5 16 Lock Washer 5 16 Weld Nut 5 16 x 3 1 2 Lag Screw 5 16 x 4 1...

Page 5: ...LDREN Hex Bolt Weld Nut Assembly Procedure Assembly Layout Align the holes in the parts to be fastened Start preliminary tightening of bolt into weld nut by hand Tighten each bolt with a wrench until...

Page 6: ...Copyright 2016 Creative Playthings NORTHBRIDGE WITH TENT 19949 100 Rev C 05 18 Page 6 PLAYSET VIEW A B C D F G H I J K U M N P AB AC AD AE AI AJ AM AL AK AS AT S V W Y Z AA L...

Page 7: ...k 12 Green W 1 40400 100 Climbing Rope X 1 15133 400 Slide Mount Green Y 5 14203 400 Steel Rung Green 1 Dia x 18 Z 10 15154 400 Rung Collar Green 1 Dia x 7 8 A 1 33978 102 Ladder Slat 5 4 x 4 x 18 3 4...

Page 8: ...ation If upon inspection hardware has sharp edges rusted or structural pieces have signs of premature failure replace them through Creative Playthings Customer Service Oil all metallic moving parts mo...

Page 9: ...Q to the front of the Inside Beam using two 5 16 x 6 Hex Bolt Assemblies Repeat with the other Main Beam and Center Block at the back of the platform frame Fasten one Post AJ to the Main Beam and pla...

Page 10: ...m STEP 5 Weld Nuts on Back Insert four 3 8 Weld Nuts into the Main Beam at the back of the tower in the positions shown Make sure the threads inside the Weld Nuts are clear as it may be hard to access...

Page 11: ...Beam as shown Place the angled face of the leg flush to the back right Post and align the holes with the holes in the Main Beam Fasten the Step Leg to the back Main Beam with 3 8 x 4 1 2 Hex Bolt Asse...

Page 12: ...pe Base Rail as shown using two 5 16 x 4 1 2 Hex Bolt Assemblies STEP 11 Rock Base Rail Fasten the Rock Base Rail M to the back left Leg as shown using two 5 16 x 4 1 2 Hex Bolt Assemblies STEP 10 Lef...

Page 13: ...n the Main Beam Fasten the Step Leg to the front Main Beam with 3 8 x 4 1 2 Hex Bolt Assemblies Fasten the Leg to the Rock Base Rail as shown using two 5 16 x 4 1 2 Hex Bolt Assemblies Front of the Gy...

Page 14: ...through one hole Swing the Side Support to rest against the side of the Leg Mark and drill a 1 4 diameter pilot hole into the Leg Add another 5 16 x 3 Hex Bolt Assembly to the Side Support and Base Ra...

Page 15: ...g the Step Support to the Platform End and Base Rail STEP 19 Rungs Place one Rung Collar Z over each end of all five Rungs Y Insert the Rung Assemblies into the holes in the Rung Leg C Z Y Lower corne...

Page 16: ...using 8 x 1 5 8 Screws in each small hole Repeat with the remaining End Deck Boards at the other end of the platform overhanging the Ladder Platform End 1 4 STEP 21 Secure Rungs Secure the Rungs usin...

Page 17: ...8 STEP 25 Rocks Fasten a Climbing Rock V to each pair of holes in the Rock Boards Use 1 4 x 1 1 2 Hex Bolts 1 4 Lock Washers 8mm Flat Washers and 1 4 weld nuts Do not over tighten the fasteners The bo...

Page 18: ...up through the bottom of a End Tent Support and one wall of the steel Tent Pipe as shown Secure the Tent Pipe to the End Tent Support using one 8 x 2 1 2 Screw Repeat with the three other ends of the...

Page 19: ...G AT NO TIME SHOULD THE BOTTOM END OF THE ROPE BE UNTIED OR LOOSE ENOUGH TO FORM A LOOP THIS PRESENTS EXTREME DANGER TO YOUR CHILDREN STEP 29 Swing Mount Swing Beam Find the center of the Main Beam on...

Page 20: ...ks using a C wrench STEP 32 Ladder Slat Place the Ladder Slat A against the underside of the Rung Leg and Rung Support The top of the Ladder Slat should be up against the bottom of the Platform End Se...

Page 21: ...should face the inside of the gym Secure the Slide Mount to the Platform Boards using four 8 x 2 1 2 Flat Head Wood Screws Drive the screws until the heads are flush with the top of the Slide Mount Do...

Page 22: ...Owner s Manual STEP 39 Hang Swings Hang the Swings in the positions shown at left It is important to hang the Ring Trapeze in the position closest to the gym U S safety standards require a minimum cle...

Reviews: