Assembly
NORTHBRIDGE WITH TENT
19949-100 Rev C (05-18)
© Copyright 2016, Creative Playthings
Page 15
ASSEMBLY INSTRUCTIONS
Front of
the Gym
Back of
the Gym
STEP 18 – Steps:
Slide the Ladder Steps (C) into the Slots in the Step Support
and the Step Leg. Make the bottom front edge of each Step
even with the face of the Step Support and Step Leg.
Fasten the Steps to the Step Support using two #8 x 2-1/2"
Screws each. Fasten the Steps to the Step Leg using two
#10 x 4-1/2" Screws each.
Tighten the fasteners connecting the Step Support to the
Platform End and Base Rail.
STEP 19 – Rungs:
Place one Rung Collar (Z) over each end of all five Rungs
(Y). Insert the Rung Assemblies into the holes in the Rung
Leg.
C
Z
Y
Lower corner of
step flush with rail.
#10 x 4-1/2" Screw
#8 x 2-1/2" Screw
STEP 20 – Rung Support:
Slide the holes in the Rung Support (P) over the ends of the
Rung Assemblies.
Fasten the top of the Rung Support to the Ladder Platform
End using one 5/16 x 3" Hex Bolt Assembly.
Fasten the bottom of the Rung Support to the Rock Base
Rail using one 5/16 x 5" Hex Bolt Assembly.
Important Note: Reverse the Hex Bolt As-
sembly so the Weld Nut is on the outside
of the gym.
P
Front of the Gym
5/16 x 3" Hex Bolt
5/16 x 4-1/2" Hex Bolt