Assembly
NORTHBRIDGE WITH TENT
19949-100 Rev C (05-18)
© Copyright 2016, Creative Playthings
Page 11
ASSEMBLY INSTRUCTIONS
AC
STEP 6 – Tip onto Back:
With the help of another person, gently tip the assembly
onto its back, with the Weld Nuts facing the ground.
STEP 7 – Step Leg:
Slide the Step Leg (AC) into place between the back
Main Beam and the back Inside Beam as shown. Place
the angled face of the leg flush to the back right Post
and align the holes with the holes in the Main Beam.
Fasten the Step Leg to the back Main Beam with 3/8
x 4-1/2" Hex Bolt Assemblies using the Weld Nuts in-
serted previously.
Right side of the Gym
3/8 x 4-1/2" Hex Bolt
STEP 8 – Rope Base Rail:
Fasten the Rope Base Rail (N) to the Step
Leg as shown, using two 5/16 x 4-1/2" Hex
Bolt Assemblies.
N
5/16 x 4-1/2" Hex Bolt
Note: Many of the illustrations on the next pages
show a slightly different model of the gym.
Assembly is the same.