© Copyright 2013, Creative Playthings
MODEL MQHAR
19856-100 Rev D (05-14)
Page 28
AssEMbLy InsTRuCTIOns
sTEP 48b – Access Ladder to Gym:
Note: Temporarily place the Slide into position to help judge
the best placement of the Access Ladder. Make sure that all
hardware has room to fit before drilling.
See the standard placement below right.
Lean the Access Ladder against the gym with the Access
Brackets flat against the Platform Front and the lower edge
of the Brackets flush with the lower edge of the Platform
Front.
Drill 5/16" diameter holes through the holes in the Brackets
and through the Platform Front. Secure the Brackets using
1/4 x 1" Hex Bolt Assemblies with Short Weld Nuts.
sTEP 49 – Chalkboard Vertical:
Hold the Chalkboard vertical (BL) against the Platform Right,
12" from the front right post as shown. Mark the position of
the hole in the Chalkboard vertical on the Platform Right. Drill
a 5/16" diameter hole through the Platform Right at the mark.
Fasten using one 1/4 x 2-1/2" Hex Bolt Assembly.
use a level to ensure the
Chalkboard vertical is plumb.
Mark the position of the hole
near the bottom onto the
Sandbox Side. Drill a 5/16"
diameter hole through the
Sandbox Side at the mark.
Fasten using one 1/4 x 2" Hex
Bolt Assembly.
sTEP 50 – Chalkboard:
Determine the best height for the Chalkboard (CL) based
on the height of the children who will use it. Also consider
the best placement of the Chalk Box shown in the next step.
Align the top corners of one Chalk Batten (O) with the top
corners of the Chalkboard. Hold them in place against the
front right post and Chalkboard vertical. Fasten in place
using two #8 x 2" Screws through the small holes in the
Chalkboard Batten.
Make sure the Chalkboard is flat against the verticals. Secure
the other Chalkboard Batten at the bottom of the chalkboard
using two #8 x 2" Screws through the small holes.
Drill 3/16" diameter holes 2" deep through the larger holes
in the Chalkboard Battens. Secure using four 1/4 x 2" Lag
Screws with Flat Washers.
From behind, secure the Chalkboard to the top and bottom
Chalk Battens using #12 x 3/4" Pan Head Screws.
1/4 x 1" Hex Bolts w/
Short Weld Nuts
1/4 x 2-1/2"
Hex Bolt
1/4 x 2"
Hex Bolt
1/4 x 2"
Lag Screw
1/4 x 2"
Lag Screw
#8 x 2"
Screw
Drill 5/16" dia. holes
1-3/8"
12"
CL
O
BL
BL
Back view