4. Remove the anti-dust plug located on the heating return
connection
z
under the boiler.
5. Connect the heating water return pipe to the heating return
connection.
6. Fit the pump in the return pipe (if possible).
¼
For the electrical connection of the pump, see chapter:
"Connecting the pump", page 28
To facilitate maintenance work, we recommend mounting
a shut off valve on the heating flow and return pipes.
CAUTION
4
The heating pipe must be mounted in accordance
with prevailing provisions.
4
If installing shut off valves, position the filling/
drainage valve, the expansion vessel and the safety
valve between the shut off valves and the boiler.
4
When installing open vented systems, the cold feed
and expansion tank heights must comply with the
requirements laid down in the Health and Safety
Executive publication PM5. The Quinta Pro boilers
require a minimum static head of 3 (Quinta Pro
30/45/65/90) or 5 (Quinta Pro 115) m.
4.5.3.
Connecting the expansion vessel
Install the expansion vessel on the heating return pipe
z
.
4.5.4.
Connecting the condensate discharge pipe
1. Fit the condensate drain hose and the syphon of the boiler
j
:
these are supplied separately.
2. Mount a standard drainage pipe, Ø 32 mm or more, leading to the
mains drainage system.
3. Insert into this the hose of the condensate drain.
4. Mount a trap or a siphon in the discharge pipe.
CAUTION
Do not make a fixed connection owing to maintenance
work on the siphon.
4
Do not plug the condensate discharge pipe.
4
Set the discharge pipe at a gradient of at least 30 mm
per metre, maximum horizontal length 5 metres.
4
Do not drain condensation water into a roof gutter at
any time.
4
Connect the condensate discharge pipe in
accordance with prevailing standards.
T002857-B
T002858-B
Quinta Pro 30 - 45 - 65 - 90 - 115