INSTALLATION MANUAL
INSTALLATION CHECKLIST (Customer copy)
59
INSTALLATION CHECKLIST
(
Customer copy
)
To ensure proper installation, you must carefully read this checklist and confirm that you have completed every step
of the installation. The customer must receive a completed copy of this checklist.
(Please check each box)
□
The base preparation steps are done correctly.
(Location and foundation preparation sections)
□
The installation steps are done correctly.
(Uncrating, cover assembly, lifting mechanism and electrical hook-up
sections)
□
The seal is properly installed and there is no steam leaking out around the cover.
(Seal application section)
□
The wiper brackets are properly installed to ensure the cover is watertight.
(Applying the wiper brackets section)
□
The key switch is
permanently installed
5 ft (1.5 m) away from the swim spa and 5 ft (1.5 m) above the ground.
□
The electrical portion of the installation was done by a certified electrician.
(Electrical hook-up, limit switch adjustment
sections)
□
All the parts that came with the COVANA cover are installed.
□
The start-up procedure is completed.
(The key sequence responds correctly and Testing the COVANA cover section
is completed.)
□
The all-weather seal functions properly.
(The cover raises and lowers properly.)
□
The middle sleeves slide freely.
(Manually slide the middle sleeve up and down when the cover is half open.)
Serial number:
__________________________________________
Installer’s name:
___________________________________________
Installer’s signature:
____________________________________________
Customer
’s name:
____________________________________________
Customer
’s signature: ____________________________________________
Customer
’s address:
____________________________________________
Date (YYYY/MM/DD): ____________________________________________
Dealer’s name:
__________________________________________
Summary of Contents for OASIS
Page 1: ...2019 Revision 0 2019 04 03 C A 232859 ...
Page 44: ...44 TECHNICAL SPECIFICATIONS INSTALLATION MANUAL NOT TO SCALE Long side LS model Figure 87 ...
Page 49: ...INSTALLATION MANUAL APPENDIX 49 APPENDIX ...
Page 50: ...50 APPENDIX INSTALLATION MANUAL ...
Page 51: ...INSTALLATION MANUAL APPENDIX 51 ...
Page 52: ...52 APPENDIX INSTALLATION MANUAL ...
Page 53: ...INSTALLATION MANUAL APPENDIX 53 ...
Page 54: ...54 APPENDIX INSTALLATION MANUAL ...
Page 55: ...INSTALLATION MANUAL APPENDIX 55 ...
Page 56: ...56 APPENDIX INSTALLATION MANUAL ...
Page 57: ...INSTALLATION MANUAL APPENDIX 57 ...
Page 58: ...58 INSTALLATION MANUAL This page intentionally left blank see next page ...