INSTALLATION MANUAL
INSTALLATION
39
WARNING:
At this point, if the ambient air temperature is
below 32
o
F (0
o
C), a temporary heater must be
placed inside the hot tub for 10 to 15 minutes.
Once the heater is in the hot tub, lower the cover
until it touches the seal to increase the air
temperature. After 10 to 15 minutes, remove the
heater and continue with the seal installation. The
rubber seal should not be overheated; the
maximum temperature it can withstand is 150
o
C
(302
o
F). Do not directly heat the acrylic and seal,
as this may cause permanent damage. Example,
do not place the heater too close to the acrylic
surface, as the surface could melt or catch fire.
Place the heater on a pedestal or spacers to
avoid directly placing it on the acrylic tub.
8) Test the seal placement by lowering the cover
1/4 in (6 mm) over the seal to ensure that the
entire perimeter
will make contact
with the
seal. If you are satisfied, raise the cover and
remove the red plastic backing off the seal.
CAUTION:
Ensure the underside of the cover is completely
dry before adhering the seal.
Make sure the seal stays tightly in the clips to
ensure its proper positioning.
9) Lower the cover onto the seal. Leave the cover
in this position for
at least
5
minutes
to ensure
proper seal-to-cover adhesion.
WARNING:
At least
5 minutes
is necessary to ensure proper
adhesion of the seal at 70°F (21°C). Less than
5
minutes
could cause the seal to release after a
short period of time.
10) Raise the cover no more than a 1/4 in (6 mm)
and leave the cover here for about 10 seconds,
as this will allow the seal to slowly and fully
release from the seal clips. You can also use a
non-abrasive plastic tool or your fingers to help
release the seal.
11) Once satisfied that the seal is released, raise
the cover 36 in (91 cm) high. Apply pressure on
the seal to properly bond the adhesive to the
underside. To apply pressure to the seal, simply
push it against the COVANA cover with your
hands.
12) Remove the seal clips and tape from the hot
tub
’s edge.
13) Lower the COVANA cover completely and leave
it there for
at least another five minutes.
This
will ensure the seal is properly bonded.
WARNING:
At least
5 minutes
is necessary to ensure proper
adhesion of the seal at 70 °F (21 °C). Less than
5
minutes
could cause the seal to release after a
short period of time.
14) Use the key to raise it about 6 in (15 cm) and
stop.
15) Make sure the cover is flat and there are no
corners higher than the others.
16) Lower the cover again, and make sure the seal
is touching the hot tub all the way around and
that no steam is leaking, especially near the
light button (for the Oasis cover with the light
kit).
17) Lift the cover all the way up and pay attention
for any unusual sounds. (screeching or
knocking) If so, refer to
Troubleshooting
section
or call your local dealer.
18)
The installation process is almost
done. There is a checklist for the
installer and the customer at the end
of this manual. Check the sections to
ensure everything has been done
properly. It is very important to sign
both copies and tear off the installer’s
copy.
Summary of Contents for OASIS
Page 1: ...2019 Revision 0 2019 04 03 C A 232859 ...
Page 44: ...44 TECHNICAL SPECIFICATIONS INSTALLATION MANUAL NOT TO SCALE Long side LS model Figure 87 ...
Page 49: ...INSTALLATION MANUAL APPENDIX 49 APPENDIX ...
Page 50: ...50 APPENDIX INSTALLATION MANUAL ...
Page 51: ...INSTALLATION MANUAL APPENDIX 51 ...
Page 52: ...52 APPENDIX INSTALLATION MANUAL ...
Page 53: ...INSTALLATION MANUAL APPENDIX 53 ...
Page 54: ...54 APPENDIX INSTALLATION MANUAL ...
Page 55: ...INSTALLATION MANUAL APPENDIX 55 ...
Page 56: ...56 APPENDIX INSTALLATION MANUAL ...
Page 57: ...INSTALLATION MANUAL APPENDIX 57 ...
Page 58: ...58 INSTALLATION MANUAL This page intentionally left blank see next page ...