Precautions
1-2 February 2016 | 256574-ENG
R01
1.2 Precautions
These precautions should be read and understood before proceeding with installation, operation,
and maintenance.
1.2.1 General
Only authorized personnel, who have been trained on the proper operation and/or
maintenance of the equipment and who have read and understood this manual
set, should operate and maintain this equipment.
Contact the responsible party, or Conviron, immediately if in doubt about safe
operation and/or maintenance of the equipment.
1.2.2 Installation
Only qualified trades-people, i.e. electricians, plumbers, refrigeration mechanics,
etc. should perform installation work as required, according to local codes and
regulations.
DO NOT attempt to install or maintain this equipment without the appropriate
knowledge and expertise.
Use extreme caution when moving the chamber. Heavy components located in
the machine compartment can cause the chamber to tip. Conviron recommends a
minimum of two people to move the chamber.
Ensure that the drain connections are secure BEFORE operation if the chamber
is equipped with a separate coil dehumidifier.
Ensure that the chamber is raised off the casters, leveled, and secured to the
floor BEFORE operating the unit.
Inspect all connections in the machine compartment BEFORE connecting the
equipment to the building utilities.
Shipping vibration can cause electrical and plumbing connections to loosen.
Inspect all connections BEFORE connecting to main building services.
1.2.3 Operation
Conduct a visual inspection of the equipment and surrounding area BEFORE
operating the chamber. Walk around the unit to ensure no debris or obstacles are
present that could pose a safety hazard.
Operate your Conviron equipment for a minimum of 5 days BEFORE introducing
any research material to ensure proper and stable operation.
Avoid direct contact with any broken fluorescent lamps. Fluorescent lamps are
extremely fragile and may emit harmful vapors when broken.
Summary of Contents for ADAPTIS A1000
Page 1: ...A1000 INSTALLATION OPERATION MAINTENANCE MANUAL 256574 ENG R01 ...
Page 14: ...Precautions 1 4 February 2016 256574 ENG R01 ...
Page 46: ...Kit Installation 2 32 February 2016 256574 ENG R01 ...
Page 54: ...Chamber Start Up and Operation 5 4 February 2016 256574 ENG R01 ...
Page 63: ......