47
7
SETTING UP CONDITIONS
65
7.1
Security
65
7.1.1
Customer-side returns
65
7.2
Listing plan
66
7.3
Setting up conditionsn
66
8
INSTALLATION AND INSTALLATION OF THE CONEL FLOW RAIN-CHAMPION
67
8.1
Security
67
8.2
Wall mounting
67
8.3
Connection of the drinking water pipe
68
8.4
Connection of the suction line
68
8.5
Connection of the pressure line
69
8.6
Connection of the emergency overflow
70
8.7
Installation of the immersion pressure probe in the storage tank
70
8.8
Connection of the electrical components of the Conel Flow Rain-Champion
71
8.8.1
Electrical connection of the control unit
71
8.9
Operating modes of the Conel Flow Rain-Champion
72
8.10
Calibration of the level probe
72
8.11
Function Pump switching machine
73
8.11.1
Possible causes of errors at the pump switching machine
73
9
INITIAL COMMISSIONING OF THE CONEL FLOW RAIN-CHAMPION
74
9.1
Security
74
9.2
Execution of the initial commissioning
75
9.2.1
Possible causes of errors during initial commissioning
76
9.3
Vent pump housing:
76
10 OPERATING STATES OF THE CONEL FLOW RAIN-CHAMPION
77
10.1
Security
77
10.2
Normal commissioning
77
10.3
Normal operation
78
10.4
Decommissioning / disassembly
79
10.4.1
Decommissioning
79
10.4.2
Dismantling
79
11 TROUBLESHOOTING
80
11.1
Security
80
11.2
Error state detection
80
11.3
First measures to eliminate faults
80
11.4
Further measures to eliminate faults
80
12 MAINTENANCE
81
12.1
Security
81
12.2
Inspection
81
12.3
Maintenance
82
12.4
Inspection and maintenance measures
82
13 DISPOSAL
85
14 CE COMPLIANCE
86