Ku-Band Solid-State Power Amplifier
Revision 0
Installation
MN/KPA.IOM
2-6
Perform the installation as follows:
Step
Procedure
1
Assemble the waveguide load and bend to the proper port of the switch.
2
Attach the rigid lower waveguide arm, using the supplied screws. The switch should be
installed with “Port 1” facing outward.
3
The upper Waveguide (flexible arm) along with the isolator bracket should be installed
next.
4
Complete the installation by attaching the coaxial cables, coaxial load, and control
cables.
5
Note that the installation of the control cables determines which unit will function as the
backup KPA. Due to the nature of the dual WG-coax switch, this will always be the
upper unit. Therefore, the end of the redundant loop cable (40, Figure 2-1) labeled “BU
SSPA,” should be connected to J4 of the upper (back-up) unit.
6
The appropriate end of the control cable attaching to the Waveguide switch (50) should
also be attached to the backup unit (J7).
Note:
Redundancy kits with all the cabling and switches for a 1:2 configuration also are
available, and are usually designed to a particular customer’s specifications. Contact
Comtech EF Data for 1:2 redundancy kits and installation diagrams.
Summary of Contents for KPA-020IN
Page 2: ......
Page 13: ...Ku Band Solid State Power Amplifier Revision 0 Preface MN KPA IOM xi NOTES...
Page 31: ...Ku Band Solid State Power Amplifier Revision 0 Installation MN KPA IOM 3 6 NOTES...
Page 33: ...Ku Band Solid State Power Amplifier Revision 0 Installation MN KPA IOM 3 8 NOTES...
Page 59: ...Ku Band Solid State Power Amplifier Revision 0 Redundant Configuration MN KPA IOM 5 6 NOTES...
Page 99: ...2114 WEST 7TH STREET TEMPE ARIZONA 85281 USA 480 333 2200 PHONE 480 333 2161 FAX...