2-14
Compaq ProLiant Clusters for SCO UnixWare 7 U/300 Quick Install Guide for the Compaq ProLiant DL380
Compaq Confidential – Need to Know Required
Writer:
Rachel Williams
Project:
Compaq ProLiant Clusters for SCO UnixWare 7 U/300 Quick Install Guide for the Compaq ProLiant DL380
Comments:
Part Number:
221544-001
File Name:
c-ch2 Setting Up Hardware.doc
Last Saved On:
12/27/00 10:59 AM
Cabling the RA4100
To cable the RA4100 components, follow these steps:
1.
Connect the Fibre Channel cabling between the arrays and nodes using
the instructions in the user guide for the RA4100 and the documentation
that comes with the Fibre Channel cables. See Figure 2-5 for a cabling
illustration.
Node 1
Node 2
Fibre Channel
Host Controller
Fibre Channel
Array Controller
GBIC (4 places)
SCSI Bus 1
5 4 3 2 1 0
SCSI Bus 2
5 4 3 2 1 0
(viewed from rear)
Dual Fiber
Optic Cable
Y
X
Figure 2-5. Supported cabling of the RA4100 storage subsystem for the
U/300 configuration
2.
Connect the first RAID controller in the upper slot (rack-mount) or right
slot (tower as viewed from the back) of the RA4100 to node 1. Connect
the redundant, or second, controller in the lower (rack-mount) or left
(tower) slot to node 2.
3.
Confirm that all cables are properly connected to the appropriate arrays
and servers.
Figure 2-5 shows the supported cabling of the RA4100 storage subsystem for
the U/300 configuration.