2-4
Compaq ProLiant Clusters for SCO UnixWare 7 U/300 Quick Install Guide for the Compaq ProLiant DL380
Compaq Confidential – Need to Know Required
Writer:
Rachel Williams
Project:
Compaq ProLiant Clusters for SCO UnixWare 7 U/300 Quick Install Guide for the Compaq ProLiant DL380
Comments:
Part Number:
221544-001
File Name:
c-ch2 Setting Up Hardware.doc
Last Saved On:
12/27/00 10:59 AM
Transporting Racks
Before transporting a filled rack, read the documentation that comes with the
rack to determine the safety measures to take for successful transportation.
Never transport a rack without first reviewing the documentation.
Develop standard procedures for securing rack equipment depending on the
rack and its components. Standard procedures include:
■
Verify that the rack is secured to the pallet.
■
Remove all loose items from the rack and the pallet.
■
Disconnect the cabling, ensuring that cables are disconnected from any
expansion cabinets and that you have labeled the cables for trouble-free
reconnection. Protect, coil, and stow the cables in the cabinet base.
■
Confirm that all major cable bundles are well secured.
■
Insert anti-static foam between components in the rack.
■
Wrap the front and rear doors of the rack in bubble wrap before securely
closing them.
■
Crate the rack according to the documentation that comes with the rack,
including protective wrapping, banding components, and any external
packaging.
■
Label the crate properly with handling information, using statements
such as This End Up, No Forklifts, Top Heavy, and Do Not Double
Stack.
■
Include tilt watch for X and Y directions and shock watch indicators.
Use these guidelines in addition to rack documentation to secure the rack for
transportation.