3-2
Rack-Mount Server Installation
For use with Intel Pentium II Xeon processor-based servers only
Writer: Salvo Project: Compaq ProLiant 5500 Servers Setup and Installation Guide Comments: 328470-001\July 1998
File Name: D-CH03.DOC Last Saved On: 7/6/98 4:04 PM
COMPAQ CONFIDENTIAL - NEED TO KNOW REQUIRED
WARNING:
A rack may become unstable if more than one
server is extended for any reason. To reduce the risk of personal
injury, always ensure that the rack is adequately stabilized before
extending a server outside the rack, and extend only one server at
a time.
WARNING:
Before beginning to work on the rack, be sure that
the leveling jacks are extended to the floor, that the full weight of
the rack rests on the level floor, and that either stabilizers are
installed or that multiple racks are coupled together for stability.
WARNING:
To avoid the risk of personal injury or damage to the
equipment, a minimum of two people
MUST
lift the server into
the rack. The server weighs in excess of 92 lb (41.8 kg). If the
unit is to be loaded above chest level, a third person must assist
in aligning the rails while the other two support the unit.
CAUTION:
Do not place anything on power cords or cables.
Arrange them so that no one may accidentally step or trip over
them. Do not pull on a cord or cable. When unplugging from the
electrical outlet, grasp the cord by the plug.
Summary of Contents for ProLiant 5500
Page 8: ......