Installing Hardware Options
4-17
Compaq Confidential – Need to Know Required
Writer:
Marcello Frau
Project:
Compaq ProLiant CL380 User Guide
Comments:
Part Number:
118128-003
File Name:
e-ch4 Installing Hardware Options.doc
Last Saved On:
8/28/00 4:41 PM
14.
Swing the cable management arm back into place
and secure the
latch
(rack model only).
ACT / LINK
B
A
1
2
SERVER NODE 2
SERVER NODE 1
Figure 4-20. Securing the cable management arm
15.
Power on the KVM switch box. Refer to the documentation that came
with your KVM switch box for instructions.
16.
Power up the shared storage area by pressing the shared storage area
Power On/Standby switch.
17.
Power up both server nodes by pressing the Power On/Standby switch
on each node.
18.
Close the front bezel doors (tower model only).