Installing Hardware Options
4-19
Compaq Confidential – Need to Know Required
Writer:
Marcello Frau
Project:
Compaq ProLiant CL380 User Guide
Comments:
Part Number:
118128-003
File Name:
e-ch4 Installing Hardware Options.doc
Last Saved On:
8/28/00 4:41 PM
Compaq R6000 UPS Cabling Diagram
The following illustration shows how the system looks after it is cabled to a
single R6000 UPS with a Multiserver card. Your UPS may differ from the
illustration.
ACT / LINK
B
A
ACT / LINK
B
A
SERVER NODE 2
SERVER NODE 1
3
4
1
2
Figure 4-21. Connecting a single UPS product to a ProLiant CL380
Configure your power management software to allow 5 minutes for
power to come back on. If power does not come back on in 5 minutes,
start the shutdown process.
NOTE:
For more information on configuring the power management software, refer to the
power management software documentation.