Powering Up the System
To power up the system, perform the following steps:
NOTE:
For information on the location and function of LED indicators, see Appendix G,
“Status LED Indicators.”
1.
Press the Power On/Standby switch
in the shared storage area.
1
2
LINK
ACT
Figure 5-14. Shared storage area and node 1 Power On/Standby switches
2.
Check the shared storage Power On/Standby switch LED indicators.
The following settings indicate that the power switch is on and the area
is operational:
The On/Standby LED turns from amber to green
Activity light flashes green
3.
When the On/Standby LED turns green, listen for the fans to start.
Watch for:
The hard drive LED indicators turn on and remain lit until the
CR3500 RAID Controller finishes its power on self-test.
The Shared Storage RAID Controller CR3500 LED indicators will
blink as the Power-On Self-Test (POST) sequence executes. The
heartbeat LED will continue to blink after the sequence is complete.