INS_CNGE28FX4TX24MS(2,POE2/48)
04/30/18 PAGE 18
INSTALLATION AND OPERATION MANUAL
CNGE28FX4TX24MS(2,POE2/48)
TECH SUPPORT: 1.888.678.9427
Handle
Figure 2-4. Installing an SFP Transceiver
If you are attaching fiber optic cables to the transceiver, continue with the following step.
Otherwise, repeat the previous steps to install the remaining SFP transceivers in the device.
6. Remove the protective plug from the SFP transceiver.
Do not remove the dust plug from the transceiver if you are not installing the fiber optic cable at
this time. The dust plug protects hardware from dust contamination.
7. Insert the fiber cable into the transceiver. The connector snaps into place and locks.
Figure 2-5. Attaching a Fiber Optic Cable to a Transceiver
8. Repeat the previous procedures to install any additional SFP transceivers in the switch. The fiber
port is now setup.
2.6.2 Removing SFP Modules
To disconnect an LC connector, use the following guidelines:
1. Press down and hold the locking clips on the upper side of the optic cable.
2. Pull the optic cable out to release it from the transceiver.