![CommScope OneCell RP5100i Hardware Installation And Commissioning Download Page 11](http://html1.mh-extra.com/html/commscope/onecell-rp5100i/onecell-rp5100i_hardware-installation-and-commissioning_2643756011.webp)
OneCell
®
Installation and Commissioning, RP5000 series, Release 4.0
xi
D
R
A
F
T
Document revision history
The following section lists documentation changes in
OneCell
®
Installation and
Commissioning, RP5000
(913035) for R4.0, the release for RP5000 series devices.
Revision 4.0.04 (June 6, 2019)
•
Appendix D, Field Replaceable Units
— Added topic,
Revision 4.0.03 (May 21, 2019)
•
Chapter 1, CommScope OneCell® overview
— Revised
Baseband Controller physical ports
on page 1-3, including
•
Chapter 5, Configuring the OneCell system
— Revised Timing Source, Boundary Clock Interface Port in
— Added GPS Information bullet to
Configuring the Baseband Controller
— Revised Whitelist Configuration in
•
Chapter 6, Verifying the OneCell installation
— Revised
Verify the OneCell system installation
•
and
Appendix D, Field Replaceable Units
Revision 4.0.02 (March 27, 2019)
•
Revised procedures in
Chapter 4, RP5100i installation
Revision 4.0.01 (March 13, 2019)
•
Initial document release
Summary of Contents for OneCell RP5100i
Page 7: ...Contents OneCell Installation and Commissioning RP5000 series Release 4 0 vii DRAFT ...
Page 10: ...List of tables x 913035 4 0 04 June 2019 DRAFT ...
Page 12: ...Document revision history xii 913035 4 0 04 June 2019 DRAFT ...
Page 18: ...About this document xviii 913035 4 0 04 June 2019 DRAFT ...
Page 20: ...DRAFT ...
Page 28: ...DRAFT ...
Page 68: ...Chapter 4 RP5100i installation 4 32 913035 4 0 04 June 2019 DRAFT Installation is complete ...
Page 69: ...DRAFT Part III Commissioning Chapter 5 Configuring the OneCell system ...
Page 70: ...DRAFT ...