![CommScope OneCell RP5100i Hardware Installation And Commissioning Download Page 40](http://html1.mh-extra.com/html/commscope/onecell-rp5100i/onecell-rp5100i_hardware-installation-and-commissioning_2643756040.webp)
Chapter 4
RP5100i installation
4-4
913035 4.0.04 June 2019
D
R
A
F
T
Mounting the Radio Point on the ceiling tile
1
Remove two ceiling tiles from the overhead.
2
Place the octagon box on the tile and trace the outline. Cut the opening.
3
Drill a 1/2-inch diameter hole for the Ethernet cable pass-through.
NOTE:
Use a 1-1/2 deep RACO 8125 or equivalent.
Hole for
mounting
plate
1-inch
diameter hole
Summary of Contents for OneCell RP5100i
Page 7: ...Contents OneCell Installation and Commissioning RP5000 series Release 4 0 vii DRAFT ...
Page 10: ...List of tables x 913035 4 0 04 June 2019 DRAFT ...
Page 12: ...Document revision history xii 913035 4 0 04 June 2019 DRAFT ...
Page 18: ...About this document xviii 913035 4 0 04 June 2019 DRAFT ...
Page 20: ...DRAFT ...
Page 28: ...DRAFT ...
Page 68: ...Chapter 4 RP5100i installation 4 32 913035 4 0 04 June 2019 DRAFT Installation is complete ...
Page 69: ...DRAFT Part III Commissioning Chapter 5 Configuring the OneCell system ...
Page 70: ...DRAFT ...