Chapter 6
Verifying the OneCell installation
6-2
913035 4.0.04 June 2019
D
R
A
F
T
Overview
This chapter describes how to verify component installation and configuration and
make sure everything is operating properly after installation and configuration.(This
process is called commissioning.)
The tools used to verify the OneCell installation are:
•
Baseband Controller and Radio Point LEDs
•
Baseband Controller Web GUI
•
Ping tests
•
User Equipment (UE) logs
Verify the OneCell system installation
To verify that the OneCell system installation is operating, check the Baseband
Controller LEDs. The STATUS, TIMING and CORE LEDs should be solid green.
For more information on troubleshooting the OneCell system installation, see
Baseband Controller LED patterns
Figure 6-1.
Baseband Controller front panel
Summary of Contents for OneCell RP5100i
Page 7: ...Contents OneCell Installation and Commissioning RP5000 series Release 4 0 vii DRAFT ...
Page 10: ...List of tables x 913035 4 0 04 June 2019 DRAFT ...
Page 12: ...Document revision history xii 913035 4 0 04 June 2019 DRAFT ...
Page 18: ...About this document xviii 913035 4 0 04 June 2019 DRAFT ...
Page 20: ...DRAFT ...
Page 28: ...DRAFT ...
Page 68: ...Chapter 4 RP5100i installation 4 32 913035 4 0 04 June 2019 DRAFT Installation is complete ...
Page 69: ...DRAFT Part III Commissioning Chapter 5 Configuring the OneCell system ...
Page 70: ...DRAFT ...