Chapter 5
Configuring the OneCell system
5-26
913035 4.0.04 June 2019
D
R
A
F
T
Table 5-3. Deployment Wizard steps
Step
Menu Name
Description
1
System Configuration
You have the option, in the System Configuration
screen, to upload a configuration file that contain all
information necessary to complete the configuration
cycle. If no configuration file is used, you will enter
configuration manually one screen at a time.
2
Deployment Questionnaire
In the Installation Wizard, you will be asked to
complete a Topology Questionnaire. This
questionnaire provides information such as the IPsec
tunnel configuration, timing sources and inclusion in
a Redundancy cluster.
3
Network Interface configuration
Network Interface configuration contains sub-menus
for configuring the following network interface
items:
•
Management Port
•
Backhaul
•
Boundary Clock
– If timing source is from a PTP server
•
Fronthaul
•
High Availability
4
Operator Network Access
configuration
Operator Network Access configuration contains
sub-menus for configuring the following operator
access items:
•
HeMS
•
Security
•
PTP Server
•
CA Server
•
Root Certificate
5
Nominal GPS Configuration
This screen contains configuration for Nominal GPS
parameters for Radio Points.
6
Trap Configuration
This screen contains configuration for SNMP traps
and displays a list of device alarms.
7
User Management
This screen is used to create and edit users and enter
authentication information for local, LDAP and
RADIUS servers.
8
Whitelist Configuration
This screen is used to enter Whitelist Radio Point
MAC addresses manually, separated by commas, or
upload Radio Point MAC addresses from an external
file.
9
License Management
This screen is used to view existing licenses, upload
a file with licenses, and download a license report.
Summary of Contents for OneCell RP5100i
Page 7: ...Contents OneCell Installation and Commissioning RP5000 series Release 4 0 vii DRAFT ...
Page 10: ...List of tables x 913035 4 0 04 June 2019 DRAFT ...
Page 12: ...Document revision history xii 913035 4 0 04 June 2019 DRAFT ...
Page 18: ...About this document xviii 913035 4 0 04 June 2019 DRAFT ...
Page 20: ...DRAFT ...
Page 28: ...DRAFT ...
Page 68: ...Chapter 4 RP5100i installation 4 32 913035 4 0 04 June 2019 DRAFT Installation is complete ...
Page 69: ...DRAFT Part III Commissioning Chapter 5 Configuring the OneCell system ...
Page 70: ...DRAFT ...