Figure 22. Routing Patch Cords into Bulkhead Storage Tray
3. Secure the patch cords to the rack using local practice.
4. Route the patch cords into the fully-open tray through the cable guides as shown.
5. Route the patch cords within the tray as shown in
Figure 23
.
Note: The sliding radius limiters must be in the position shown.
ROUTE CABLE INTO
2RU FMT THROUGH
SLIDING RADIUS LIMITER
24297-A
REQUIRED
POSITION
OF SLIDING
RADIUS
LIMITER
(2 PLACES)
VELCRO
TIE-OFF
POINT
ROUTE BEHIND
RADIUS LIMITER
2 x 2
FiberGuide
2 x 2
FiberGuide
DETAIL OF
CABLE TIE-OFF
POINTS
TIE
LANCE
LOCATIONS
2 MM