ADCP-90-459 • Issue 2 • June 2016
Page 22
© 2016
CommScope
. All Rights Reserved.
1. Open the tray fully and lock it using the lock open latch (see
Subsection 7.1 Opening the
Tray
).
2. Route cables along the rack to the 2RU FMT, as shown in
Figure 19
. Route cable to be
spliced on the left side of the rack. Route cable to be terminated on the right side of the rack.
3. Secure the cables to the rack using local practice.
Figure 19. Securing Cables Within 48-Position Termination/Splice Tray
4. Route the cables into the fully-open tray through the cable guides as shown.
5. Route the cables within the tray as shown in
Figure 20
.
Note: The cables may be routed from either above or below the tray.
Note: The sliding radius limiters must be in the position shown.
Note: Always clean and inspect connectors and adapters before mating them. For
guidelines, refer to the connector cleaning instructions, ADCP-90-159.
ROUTE CABLE INTO
2RU FMT THROUGH
S
LIDING RADIU
S
LIMITER
19
3
9
3
-C
REQUIRED
PO
S
ITION
OF
S
LIDING
RADIU
S
LIMITER
(2 PLACE
S
)
TIE
LANCE
S
DETAIL OF
CABLE TIE-OFF
POINT
S
VELCRO
TIE-OFF
POINT
ROUTE BEHIND
RADIU
S
LIMITER
900 MICRON
S
UBUNIT
FANOUT
POINT
2 x 2
FiberGuide